Superstructures
<p> You do not have the latest version of Macromedia Flash Player or Javascript is disabled. This web site makes use of <a href="http://www.macromedia.com/software/flash">Macromedia ® Flash TM software</a>. Why not download and install the latest version now? <a href="http://www.macromedia.com/go/getflashplayer">Install Macromedia Flash Player</a>. </p>

John Doyle Construction have a proven track record in the field of structural frames, from prestiguous architectural offices with high specification, fine tolerance exposed finishes to general core construction and concrete composite floors.

St James's Gateway

Work Undertaken: Construction of 2 storey basement box around temporary props, retained facade and GSHP contractors.  Removal of propping (installed by others).  Drainage.  Concrete toppings to metal decking to 6 levels above ground floor. Residential area has RC frame.
Client: Stanhope PLC
Value: £2,510,245.00
Construction Period: 43 weeks

Hanover Square

Work Undertaken: Mixed commercial and residential development.  Construct single storey basement within existing basement. Minor excavation required. Drainage and ducts. RC ground floor. PT floors 1-6. RC cores, walls and blade columns.
Client: Stanhope PLC
Value: £2,945,831.00
Construction Period: 30 weeks

Burntwood School

Work Undertaken: Substructure and Superstructure with sitewide drainage
Client: Wandsworth BC.
Value: £4,470,000.00
Construction Period: 58 weeks

New Street Station Birmingham

Work Undertaken: Steelwork Frame, Concrete Remedials and Hinterland Groundworks and Frame
Client: Network Rail, Birmingham
Value: £8,461,357.17
Construction Period: 119 weeks

Southfields School

Work Undertaken: Enabling Works
Client:  Wandsworth BC
Value: £266,809.08
Construction Period: 10 weeks

 

Cafe Royal

Work Undertaken: RC Basement, Substructure and Superstructure
Client: Mace Limited
Value: £4,500,000.00
Construction Period: 46 weeks

City of Westminster College

Work Undertaken: Concrete Subs/Superstructure, including Drainage
Client: McLaren Limited
Value: £11,000,000
Construction Period: 63 weeks

York University

Work Undertaken: Substructure & Superstructure
Client: University of York (For BAM Construct UK)
Value: £3,700,000
Construction Period: 26 Weeks 

Ravensbourne College

Work Undertaken: Substructure, Drainage and RC Superstructure
Client: Bovis Lend Lease for Meridian Delta Limited
Value: £5,200,000
Construction Period: 32 weeks

Brooklands Hotel

Work Undertaken: Enabling Works, Groundworks and PT Frame
Client: Bowmer & Kirkland for Delancey 
Value: £4,000,000
Construction Period: 36 weeks

Hilton Hotel Liverpool

Work Undertaken: Sub & Superstructure, Drainage
Client: Kier Build, for Liverpool Site 11 Hotel Ltd.
Value: £7,850,000
Construction Period: 48 weeks

X2 Hatton Cross Centre

Work Undertaken: Reinforced Concrete Podium Deck & Ramps
Client: Wates Construction Ltd
Value: £2,810,000
Construction Period: 28 Weeks 

More London Plot 7

Work Undertaken: Groundworks, Drainage & RC works to Sub & Superstructure
Client: Mace Ltd. for London Bridge Developments
Value: £12,100,000
Construction Period: 72 Weeks

Project Eisai, Hatfield

Work Undertaken: Substructures & Superstructures
Client: Bowmer & Kirkland (For Arlington Business Parks Group Ltd)
Value: £4,090,000
Construction Period: 24 Weeks 

Aero Engine Test Bed Derby

Work Undertaken: Reinforced Concrete Substructure & Superstructure
Client: Bowmer & Kirkland for Cullum Detuners
Value: £4,948,806,000
Construction Period: 46 Weeks 

Albion Riverside

Work Undertaken: Sub & Superstructure & Hard and Soft Landscaping
Client: Exterior plc
Value: £20,900,000
Construction Period: 44 weeks

More London Plot 5

Work Undertaken: Sub/Superstructure, Drainage
Client: Bovis Lend Lease
Value: £5,000,000
Construction Period: 45 weeks

British Museum

Work Undertaken: Excavation and Concrete works below and above ground level to form the new Great Court
Client: Trustees of the British Museum
Value: £6,800,000
Construction Period: 52 weeks

City Place Gatwick Airport

Work Undertaken: Sub & Superstructure
Client: Bovis Lend Lease
Value: £3,440,000
Construction Period: 28 weeks

Canon Reigate

Work Undertaken: Sub/Superstructure and Waterproofing
Client: Canon Properties (UK) Ltd
Value: £2,700,000
Construction Period: 32 weeks