| Superstructures |
St James's Gateway
Work Undertaken: Construction of 2 storey basement box around temporary props, retained facade and GSHP contractors. Removal of propping (installed by others). Drainage. Concrete toppings to metal decking to 6 levels above ground floor. Residential area has RC frame. Hanover Square
Work Undertaken: Mixed commercial and residential development. Construct single storey basement within existing basement. Minor excavation required. Drainage and ducts. RC ground floor. PT floors 1-6. RC cores, walls and blade columns. Burntwood School
Work Undertaken: Substructure and Superstructure with sitewide drainage New Street Station Birmingham
Work Undertaken: Steelwork Frame, Concrete Remedials and Hinterland Groundworks and Frame Southfields School
Work Undertaken: Enabling Works
Cafe RoyalWork Undertaken: RC Basement, Substructure and Superstructure Client: Mace Limited Value: £4,500,000.00 Construction Period: 46 weeks City of Westminster CollegeWork Undertaken: Concrete Subs/Superstructure, including Drainage Client: McLaren Limited Value: £11,000,000 Construction Period: 63 weeks York UniversityWork Undertaken: Substructure & Superstructure Client: University of York (For BAM Construct UK) Value: £3,700,000 Construction Period: 26 Weeks Ravensbourne College
Work Undertaken: Substructure, Drainage and RC Superstructure Brooklands Hotel
Work Undertaken: Enabling Works, Groundworks and PT Frame Hilton Hotel LiverpoolWork Undertaken: Sub & Superstructure, Drainage Client: Kier Build, for Liverpool Site 11 Hotel Ltd. Value: £7,850,000 Construction Period: 48 weeks X2 Hatton Cross CentreWork Undertaken: Reinforced Concrete Podium Deck & Ramps Client: Wates Construction Ltd Value: £2,810,000 Construction Period: 28 Weeks More London Plot 7
Work Undertaken: Groundworks, Drainage & RC works to Sub & Superstructure Project Eisai, HatfieldWork Undertaken: Substructures & Superstructures Client: Bowmer & Kirkland (For Arlington Business Parks Group Ltd) Value: £4,090,000 Construction Period: 24 Weeks Aero Engine Test Bed DerbyWork Undertaken: Reinforced Concrete Substructure & Superstructure Client: Bowmer & Kirkland for Cullum Detuners Value: £4,948,806,000 Construction Period: 46 Weeks Albion RiversideWork Undertaken: Sub & Superstructure & Hard and Soft Landscaping Client: Exterior plc Value: £20,900,000 Construction Period: 44 weeks More London Plot 5Work Undertaken: Sub/Superstructure, Drainage Client: Bovis Lend Lease Value: £5,000,000 Construction Period: 45 weeks British MuseumWork Undertaken: Excavation and Concrete works below and above ground level to form the new Great Court Client: Trustees of the British Museum Value: £6,800,000 Construction Period: 52 weeks City Place Gatwick AirportWork Undertaken: Sub & Superstructure Client: Bovis Lend Lease Value: £3,440,000 Construction Period: 28 weeks Canon ReigateWork Undertaken: Sub/Superstructure and Waterproofing Client: Canon Properties (UK) Ltd Value: £2,700,000 Construction Period: 32 weeks |
||||