| Substructures |
St James's Gateway
Work Undertaken: Construction of 2 storey basement box working around temporary propping, retained facades and GSHP contractors. Removal of propping (installed by others). Drainage. Toppings to composite metal decking to 6 levels above ground floor. Residential area has a RC frame Hanover Square
Work Undertaken: Mixed commercial and residential development. Construct single storey basement within existing basement. Minor excavation required. Drainage and ducts. RC ground floor. PT floors 1-6. RC cores, walls and blade columns. New Street Station Birmingham
Work Undertaken: Steelwork Frame, Concrete Remedials and Hinterland Groundworks and Frame Burntwood School
Work Undertaken: Substructure and Superstructure with sitewide drainage Imperial CollegeWork Undertaken: Concrete Subs/Superstructure, including Drainage Client: Bovis Value: £11,000,000 Construction Period: 63 weeks City of Westminster CollegeWork Undertaken: Concrete Subs/Superstructure, including Drainage Client: McLaren Limited Value: £11,000,000 Construction Period: 63 weeks Kings Cross Central R5 Building
Work Undertaken: Enabling works, groundworks and substructure Southfields School
Work Undertaken: Enabling Works
Gatwick Airport North TerminalWork Undertaken: Groundworks, RC Substructure, Concrete Toppings etc. Client: Gatwick Airport Limited Value: £1,300,000.00 Construction Period: 29 weeks Cafe RoyalWork Undertaken: RC Basement, Substructure and Superstructure Client: Mace Limited Value: £4,500,000.00 Construction Period: 46 weeks York UniversityWork Undertaken: Substructure & Superstructure Client: University of York (For BAM Construct UK) Value: £3,700,000 Construction Period: 26 Weeks Brooklands Hotel
Work Undertaken: Enabling Works, Groundworks and Drainage Athletes Village Plots 1 and 2Work Undertaken: Substructure and Drainage Client: Bovis Lend Lease Value: £3.7M Construction Period: 20 weeks Ravensbourne College
Work Undertaken: Substructure, Drainage and RC Superstructure Aero Engine Test Bed DerbyWork Undertaken: Reinforced Concrete Substructure & Superstructure Client: Bowmer & Kirkland for Cullum Detuners Value: £4,948,806,000 Construction Period: 46 Weeks More London Plot 7
Work Undertaken: Groundworks, Drainage & RC works to Sub & Superstructure Project Eisai, HatfieldWork Undertaken: Substructures & Superstructures Client: Bowmer & Kirkland (For Arlington Business Parks Group Ltd) Value: £4,090,000 Construction Period: 24 Weeks 201 BishopsgateWork Undertaken: Substructure, Concrete Toppings and External Works Client: Bovis Lend Lease Value: £9,690,000 Construction Period: 25 and 40 and 18 weeks Albion RiversideWork Undertaken: Sub & Superstructure & Hard and Soft Landscaping Client: Exterior plc Value: £20,900,000 Construction Period: 44 weeks Arndale ManchesterWork Undertaken: Substructure, drainage, in-situ concrete floors Client: Bovis Lend Lease Value: £9,571,804 Construction Period: 48 Weeks |
||||